CoasterGallery.com

Georgia Cyclone

On this ride, there are usually nine wood boards placed on top of each other in order to form the running rails.  In 2012, nearly a third of the track's length was covered with Rocky Mountain Construction Topper Track.  This steel replaced the top two layers of wood.  It not only provides a smoother ride, it also reduces the large amount of work required to maintain wood coaster track.

Topper Track by Rocky Mountain Construction

Home SFOG Index           Previous Cyclone picture Next Cyclone picture


©2014 Joel A. Rogers.