Grizzly
From 1983 to 1994, Morgan trains were built for a dozen different wooden roller coasters. Since then, the Morgan trains have been replaced by PTC trains on three coasters, one ride has been torn down, and another ride has been relegated to Standing But Not Operating status.
Grizlly currently runs with two trains on most days.
©2017 by Joel A. Rogers