A chain lift pulls the trains out of the loading platform and right up the 32-metre (105-foot) high lift hill. The first part of the lift hill curves to the right. The lift straightens out as the train approaches the top of the first hill. It is highly unusual to have curved track with a chain lift.
©2016 Joel A. Rogers.