Diamondback
Diamondback will feature three trains with an unusual configuration. The riders in the back of each train will be offest from the riders in the front of the train. This will ensure the people in the back will have a better view.
Over 1,500 tons of steel will be used to create this ride. It will have ten drops and lots of airtime, and will cover ten acres of Kings Island. A lot of the ride will be in the woods by the Beast. The end of the ride will have a water splash like on SheiKra.
This picture clearly shows the concrete that will contain the water feature.
©2008 by Joel A. Rogers